Skip to content

Growth cockpit

Sandbox — fixtures only, nothing connected

InboxContentSpendAllkeysyfolio
Waiting on you
Finished posts. Approve, edit, or send back4 to decide
1 blocked3 clear
keysyMandate countdown — carousel, three frameskeysy has no instagram channel configuredBlocked3 of 5 not checkedTue 18 Aug, 17:30instagram · past its slot
kekeysy.fr
Poster reading “September 2026 — electronic invoicing becomes mandatory”1/3

keysy.fr Septembre 2026 : la facture électronique devient obligatoire pour toutes les entreprises françaises. Pour un syndic, cela … more

3 frames

Drafted

Drafted by content-agent · CLM-K01

Aimed at

Property managers preparing for the mandateReach not measured

Where they are: Instagram and LinkedIn, evenings

Why we think so: Mandate searches doubled month on month since June — inferred, not measured on our own traffic

What was checked

  • Channel fitkeysy has no instagram channel configured
  • ClaimsCLM-K01 publishable on the day this goes out
  • Audience fitNothing reads the register or the assumed knowledge yet. Needs an audience model and an LLM.
  • TimingNothing knows what else goes out that day. Needs a cadence model, which does not exist.
  • Brand voiceNothing compares this against recent posts yet. Needs the voice rubric and an LLM.

Visual brief

Countdown poster, then the three steps, then the offer. Typographic, no stock photography.

Cannot be approved

A failed check is not something approving fixes — the repair is upstream of this screen. Send it back and the agent redrafts against the corrected ledger.

TextkeysyMandate explainer — the long version, for searchAll checks clear3 of 5 not checkedMon 17 Aug, 08:00blog · past its slot
blog

La facture électronique devient obligatoire le 1er septembre 2026. Pour un gestionnaire immobilier, la réforme se résume à trois décisions et une échéance. La première est le choix d’une plateforme de dématérialisation partenaire. La seconde est le format dans lequel vos factures de charges sortent aujourd’hui — Factur-X ou rien. La troisième est la reprise de l’historique, qui prend plus de temps que les deux autres réunies. Aucun des quatre concurrents que nous avons étudiés ne propose encore Chorus Pro ou Factur-X. Ce qui suit détaille chacune, dans l’ordre où il faut les traiter.

No visual

Drafted

Drafted by content-agent · CLM-K01

Aimed at

Independent syndics, 50–400 lots · ~4,200 reachable

What was checked

  • ClaimsCLM-K01 publishable on the day this goes out
  • Channel fit593 characters — blog sets no limit
  • Audience fitNothing reads the register or the assumed knowledge yet. Needs an audience model and an LLM.
  • TimingNothing knows what else goes out that day. Needs a cadence model, which does not exist.
  • Brand voiceNothing compares this against recent posts yet. Needs the voice rubric and an LLM.
TextkeysyWhy nobody is ready for September — text postAll checks clear3 of 5 not checkedTue 18 Aug, 07:00li_page · past its slot
Ke

Keysy

Independent syndics, 50–400 lots

We surveyed four SMB property-management platforms this spring. None of them offers Chorus Pro or Factur-X today, four months before the mandate. That is not a criticism of them. It is a scheduling problem: the format work is unglamorous, it is invisible to the buyer until the deadline, and it competes with whatever is on the roadmap. If you manage a portfolio and your provider has not told you which platform they are routing through, that is the question worth asking this month.

No visual

Drafted

Drafted by content-agent · CLM-K01

Aimed at

Independent syndics, 50–400 lots · ~4,200 reachable

What was checked

  • ClaimsCLM-K01 publishable on the day this goes out
  • Channel fit486 characters, inside li_page’s 3,000
  • Audience fitNothing reads the register or the assumed knowledge yet. Needs an audience model and an LLM.
  • TimingNothing knows what else goes out that day. Needs a cadence model, which does not exist.
  • Brand voiceNothing compares this against recent posts yet. Needs the voice rubric and an LLM.
TextkeysyMandate guide — send to the waiting listAll checks clear3 of 5 not checkedThu 20 Aug, 07:00email · past its slot
email

Objet : votre plateforme est-elle prête pour septembre ? Bonjour, Nous avons rassemblé ce qui change concrètement au 1er septembre 2026 pour un syndic : le format, l’agrément de la plateforme, et les trois vérifications à faire auprès de vos prestataires. Le guide est ici — il fait quatre pages et se lit en dix minutes.

No visual

Drafted

Drafted by content-agent

Aimed at

Independent syndics, 50–400 lots · ~4,200 reachable

What was checked

  • ClaimsCites no claims — there is nothing here to be wrong about
  • Channel fit324 characters — email sets no limit
  • Audience fitNothing reads the register or the assumed knowledge yet. Needs an audience model and an LLM.
  • TimingNothing knows what else goes out that day. Needs a cadence model, which does not exist.
  • Brand voiceNothing compares this against recent posts yet. Needs the voice rubric and an LLM.